- Drilling Works, Laboratory Works and Preparing Soil Investigation Reports within the scope of Ashgabat-Turkmenbashi Highway Project, POLIMEKS, 2017
- Soil Mechanics Laboratory Works
- Quartzite Drillings in Çine, Aydın, POLAT MINING CO., 2017
- General Directorate of Highways, Preparing Geotechnical Report of Yazyurdu Landslide Prevention Project, BOTEK CO., 2015
- 3D Modelling of Faizabad (Afghanistan) Dam and Preparing Isopac Maps, FEKA CONST. CO., 2015
- Drillings of Coal Areas in Tavas Avdan, AVDAN MIN. ENG. IND. and TRADE CO., 2014
- Preparing Geotechnical Report for the Prevention of the Settlements at Km:353+600-355+000 on Basmane-Afyon Line (Dumlupınar), TURKISH STATE RAILWAYS 3RD REGION, 2013
- Landslip Survey of Gaziemir Highway, IZMIR METROPOLITAN MUNICIPALITY, 2010
- Marine Drillings and Geological and Geotechnical Reporting of Aras Hotel Scaffold Project, ARAS TUR CO., 2010
- Soil Injection Works for Bayındır Arıkbaşı Pond, IZMIR SPECIAL PROVINCIAL ADMINISTRATION, 2010
- Landslide Investigation of H-100 Way in Tüpraş, TUPRAS, 2009
- Well Drillings for Emet Eti Boron Operations, ETI MINING, EMET BORON OPERATIONS DIRECTORATE, 2007
- Drillings and Natural Construction Material Investigations of Ödemiş – Aktaş Dams, SU-YAPI CO., 2006